| 
 
 
 |  | | 
 | 
 
 
 | Basic steps includes in Life Cycle of Bug Question Posted on 17 Feb 2020
 
 Home >> Testing >> Testing Questions >> Basic steps includes in Life Cycle of Bug
 | 
 
 
 
 
 | Basic steps includes in Life Cycle of Bug Below are the seven steps included in life cycle of Bug
 (1)First step is once tester identified the Bug or Defect he will assigned that to
 
 development manager in open status.
 (2)Second step is to check is the defect or bug raised is valid or not if it is then
 
 it will transfer to development team to fix it.
 (3)Third step is to check if defect is not valid then it will be ignored or
 
 rejected.
 (4)Fourth step is to check whether it is in scope or not. If bug is not part of
 
 current release then defect should be postponed.
 (5)Fifth step is to check if defect or bug is allready raised then it will assign as duplicate status.
 (6)Sixth step is handle by the developer  while they are busy in fiing the defect it will be given in in-progress status.
 (7)And final step here is once the developer repaired the status is changed to fixed and once tester will test then it will chang status to fixed it is passes in final test.
 |  | 
 
 
 
 
 
 
 
 
 
 
 |  |  |  | 
 |